75U NOTAMs
Active notices for Harry S Truman Dam & Reservoir (75U), Warsaw, MO. 2 in force, as of 21 Sep 2026 1623Z. · Open on the map
All of Harry S Truman Dam & Reservoir — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 13 Aug 2026 0932Z to 27 Sep 2026 0931Z · NOTAM 08/297
OBST TOWER LGT (ASR 1324009) 381426.16N0931855.31W (5.0NM ENE 75U) 1228FT (365FT AGL) U/S
08/297 NOTAMN<br/> <b>Q) </b>KZKC/QOLAS/IV/M/AE/000/013/3813N09325W005<br/> <b>A) </b>75U<br/> <b>B) </b>2608130932<br/> <b>C) </b>2609270931<br/> <b>E) </b> TOWER LGT (ASR 1324009) 381426.16N0931855.31W (5.0NM ENE 75U) 1228FT (365FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 21 Sep 2026 0617Z to 6 Oct 2026 0517Z · NOTAM 09/349
OBST TOWER LGT (ASR 1284990) 380249.90N0933544.80W (13.3NM SW 75U) 1201.8FT (255.9FT AGL) U/S
09/349 NOTAMN<br/> <b>Q) </b>KZKC/QOLAS/IV/M/E/000/013/3813N09325W005<br/> <b>A) </b>75U<br/> <b>B) </b>2609210617<br/> <b>C) </b>2610060517<br/> <b>E) </b> TOWER LGT (ASR 1284990) 380249.90N0933544.80W (13.3NM SW 75U) 1201.8FT (255.9FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 75U right now?
Harry S Truman Dam & Reservoir has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 75U
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.