4N1 NOTAMs
Active notices for Greenwood Lake (4N1), West Milford, NJ. 2 in force, as of 3 Nov 2026 0250Z. · Open on the map
All of Greenwood Lake — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 1
FAA text
Procedures 1
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 1 active
Tower lights — unserviceable
MediumFrom 27 Oct 2026 1547Z to 20 Nov 2026 2359Z · NOTAM 10/211
OBST TOWER LGT (ASR 1333433) 410648.50N0742446.50W (3NM SW 4N1) 1447FT (300FT AGL) U/S
!MIV 10/211 4N1 OBST TOWER LGT (ASR 1333433) 410648.50N0742446.50W (3NM SW 4N1) 1447FT (300FT AGL) U/S 2610271547-2611202359
Procedures · 1 active
Takeoff minimums and obstacle departure procedures changed
MediumFrom 7 Nov 2024 2040Z to 7 Nov 2026 2038Z (estimated) · NOTAM 4/0951 · FDC
ODP GREENWOOD LAKE, WEST MILFORD, NJ. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKE-OFF MINIMUMS: RWY 24, 500-2 3/4 WITH MINIMUM CLIMB OF 220 FPNM TO 1400; OR 1300-2 3/4 FOR CLIMB IN VISUAL CONDITIONS. ALL OTHER DATA REMAINS AS PUBLISHED. 2411072040-2611072038EST
!FDC 4/0951 4N1 ODP GREENWOOD LAKE, WEST MILFORD, NJ. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKE-OFF MINIMUMS: RWY 24, 500-2 3/4 WITH MINIMUM CLIMB OF 220 FPNM TO 1400; OR 1300-2 3/4 FOR CLIMB IN VISUAL CONDITIONS. ALL OTHER DATA REMAINS AS PUBLISHED. 2411072040-2611072038EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 4N1 right now?
Greenwood Lake has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 4N1
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.