94R NOTAMs
Active notices for Gav Air Airport (94R), Wharton, TX. 2 in force, as of 2 Sep 2026 0336Z. · Open on the map
All of Gav Air Airport — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated just now
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Power line lights — unserviceable
MediumFrom 28 Aug 2026 2150Z to 12 Sep 2026 2150Z · NOTAM 08/671
OBST POWER LINE LGT (ASN 2020-ASW-7830-OE) 291100N0955923W (4.9NM S 94R) 312FT (236FT AGL) U/S
08/671 NOTAMN<br/> <b>Q) </b>KZHU/QOLAS/IV/M/AE/000/004/2915N09600W005<br/> <b>A) </b>94R<br/> <b>B) </b>2608282150<br/> <b>C) </b>2609122150<br/> <b>E) </b> POWER LINE LGT (ASN 2020-ASW-7830-OE) 291100N0955923W (4.9NM S 94R) 312FT (236FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 27 Aug 2026 1907Z to 25 Nov 2026 2007Z · NOTAM 08/630
OBST TOWER LGT (ASR 1050663) 292133.10N0960516.10W (7.0NM NW 94R) 584.0FT (486.9FT AGL) U/S
08/630 NOTAMN<br/> <b>Q) </b>KZHU/QOLAS/IV/M/E/000/006/2915N09600W005<br/> <b>A) </b>94R<br/> <b>B) </b>2608271907<br/> <b>C) </b>2611252007<br/> <b>E) </b> TOWER LGT (ASR 1050663) 292133.10N0960516.10W (7.0NM NW 94R) 584.0FT (486.9FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 94R right now?
Gav Air Airport has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 94R
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.