F06 NOTAMs
Active notices for Marian Airpark (F06), Wellington, TX. 2 in force, as of 18 Sep 2026 0923Z. · Open on the map
All of Marian Airpark — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 8 Sep 2026 1919Z to 1 Oct 2026 1700Z · NOTAM 09/260
OBST TOWER LGT (ASR 1256352) 343958.90N1001115.40W (10.7NM S F06) 2059.1FT (253.9FT AGL) U/S
09/260 NOTAMN<BR> <B>Q) </B>KZFW/QOLAS/IV/M/E/000/021/3450N10011W005<BR> <B>A) </B> <BR> <B>B) </B>2609081919<BR> <B>C) </B>2610011700<BR> <B>E) </B> TOWER LGT (ASR 1256352) 343958.90N1001115.40W (10.7NM S F06) 2059.1FT (253.9FT AGL) U/S<BR>
Tower lights — unserviceable
MediumFrom 16 Sep 2026 2255Z to 14 Jan 2027 2255Z · NOTAM 09/577
OBST TOWER LGT (ASR 1276881) 345139.40N1000907.20W (2.3NM ENE F06) 2278.5FT (306.8FT AGL) U/S
09/577 NOTAMN<br/> <b>Q) </b>KZFW/QOLAS/IV/M/AE/000/023/3450N10011W005<br/> <b>A) </b>F06<br/> <b>B) </b>2609162255<br/> <b>C) </b>2701142255<br/> <b>E) </b> TOWER LGT (ASR 1276881) 345139.40N1000907.20W (2.3NM ENE F06) 2278.5FT (306.8FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at F06 right now?
Marian Airpark has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about F06
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.