KBNL NOTAMs
Active notices for Barnwell Regional (BNL · KBNL), Barnwell, SC. 3 in force, as of 21 Sep 2026 0520Z. · Open on the map
All of Barnwell Regional — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Lighting 1
Obstacles 2
All 3 active NOTAMs every severity, with windows and raw text
Lighting · 1 active
Runway 17 — unserviceable
MediumFrom 7 Aug 2026 1343Z to 10 Feb 2027 2111Z (estimated) · NOTAM 08/114
RWY 17 /35 REDL U/S
NOT AVAILABLE
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 28 Aug 2026 1828Z to 29 Sep 2026 1700Z · NOTAM 08/518
OBST TOWER LGT (ASR 1280698) 332336.10N0812814.10W (9.0NM NNW BNL) 617.1FT (261.2FT AGL) U/S
08/518 NOTAMN<BR> <B>Q) </B>KZJX/QOLAS/IV/M/E/000/007/3315N08123W005<BR> <B>A) </B>KBNL<BR> <B>B) </B>2608281828<BR> <B>C) </B>2609291700<BR> <B>E) </B> TOWER LGT (ASR 1280698) 332336.10N0812814.10W (9.0NM NNW BNL) 617.1FT (261.2FT AGL) U/S<BR>
Tower lights — unserviceable
MediumFrom 21 Aug 2026 0548Z to 19 Nov 2026 0648Z · NOTAM 08/353
OBST TOWER LGT (ASR 1220592) 332413.50N0813316.30W (11.9NM NW BNL) 669.0FT (306.1FT AGL) U/S
08/353 NOTAMN<br/> <b>Q) </b>KZJX/QOLAS/IV/M/E/000/007/3315N08123W005<br/> <b>A) </b>KBNL<br/> <b>B) </b>2608210548<br/> <b>C) </b>2611190648<br/> <b>E) </b> TOWER LGT (ASR 1220592) 332413.50N0813316.30W (11.9NM NW BNL) 669.0FT (306.1FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KBNL right now?
Barnwell Regional has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KBNL
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.