KBRG NOTAMs
Active notices for Belen Regional (BRG · KBRG), Belen, NM. 3 in force, as of 2 Nov 2026 0747Z. · Open on the map
All of Belen Regional — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Lighting 1
FAA text
Procedures 1
All 3 active NOTAMs every severity, with windows and raw text
Lighting · 1 active
Runway 21 — VASI unserviceable
MediumFrom 3 Sep 2026 2036Z to 31 Dec 2026 2359Z · NOTAM 09/002
RWY 21 PULSATING VASI U/S
!BRG 09/002 BRG RWY 21 PULSATING VASI U/S 2609032036-2612312359
Airspace · 1 active
Parachute jumping
LowFrom 9 Jan 2026 1300Z to 28 Dec 2026 0400Z · NOTAM 01/002
AIRSPACE PJE WI AN AREA DEFINED AS 3NM RADIUS OF BRG SFC-12999FT FRI-SUN 1300-0400
!BRG 01/002 BRG AIRSPACE PJE WI AN AREA DEFINED AS 3NM RADIUS OF BRG SFC-12999FT FRI-SUN 1300-0400 2601091300-2612280400
Procedures · 1 active
Approach RNAV (GPS) RWY 21 changed
MediumFrom 17 Jan 2025 1633Z to 17 Jan 2027 1633Z (estimated) · NOTAM 5/4484 · FDC
IAP BELEN RGNL, BELEN, NM. RNAV (GPS) RWY 21, AMDT 1... CIRCLING CAT A MDA 5640/HAA 440. 2501171633-2701171633EST
!FDC 5/4484 BRG IAP BELEN RGNL, BELEN, NM. RNAV (GPS) RWY 21, AMDT 1... CIRCLING CAT A MDA 5640/HAA 440. 2501171633-2701171633EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KBRG right now?
Belen Regional has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KBRG
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.