KBUU NOTAMs
Active notices for Burlington Municipal (BUU · KBUU), Burlington, WI. 3 in force, as of 21 Sep 2026 0538Z. · Open on the map
All of Burlington Municipal — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 3 min ago
Lighting 1
Obstacles 1
All 3 active NOTAMs every severity, with windows and raw text
Airport · 1 active
SVC AUTOMATED WX BCST SYSTEM PRESENT WX UNREL
LowFrom 30 Jul 2026 0042Z to 6 Aug 2027 2359Z (estimated) · NOTAM 07/021
SVC AUTOMATED WX BCST SYSTEM PRESENT WX UNREL
07/021 NOTAMN Q)KZAU/QXXXX/IV/NBO/A/000/999/4241N08818W005 A) KBUU B) 2607300042 C) 2708062359EST E) SVC AUTOMATED WX BCST SYSTEM PRESENT WX UNREL
Lighting · 1 active
Runway 11 — unserviceable
MediumFrom 7 Aug 2026 1319Z to 30 Sep 2026 2359Z · NOTAM 08/001
RWY 11 PAPI U/S
!BUU 08/001 BUU RWY 11 PAPI U/S 2608071319-2609302359
Obstacles · 1 active
Tower lights — unserviceable
MediumFrom 11 Sep 2026 1708Z to 11 Nov 2026 2359Z · NOTAM 09/001
OBST TOWER LGT (ASR 1048079) 423940.00N0881810.00W (1.8NM S BUU) 1024.0FT (194.9FT AGL) U/S
09/001 NOTAMN<BR> <B>Q) </B>KZAU/QOLAS/IV/M/AE/000/011/4241N08818W005<BR> <B>A) </B>KBUU<BR> <B>B) </B>2609111708<BR> <B>C) </B>2611112359<BR> <B>E) </B> TOWER LGT (ASR 1048079) 423940.00N0881810.00W (1.8NM S BUU) 1024.0FT (194.9FT AGL) U/S<BR>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KBUU right now?
Burlington Municipal has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KBUU
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.