KCKM NOTAMs

Active notices for Fletcher Field (CKM · KCKM), Clarksdale, MS. 2 in force, as of 21 Sep 2026 1105Z. · Open on the map

All of Fletcher Field — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 2 min ago

Airport 1

SVC AUTOMATED WX BCST SYSTEM T/DP/CEILING/PRESENT WX UNREL
07/863Active · expires in 124d (est.)

Obstacles 1

Tower lights — unserviceable
OBST TOWER LGT (ASR 1052941) 340910.80N0903219.70W (8.9NM S CKM) 493.4FT (329.7FT AGL) U/S
09/422Active · expires in 113d
All 2 active NOTAMs every severity, with windows and raw text

Airport · 1 active

SVC AUTOMATED WX BCST SYSTEM T/DP/CEILING/PRESENT WX UNREL
Medium

From 30 Jul 2026 0100Z to 22 Jan 2027 2359Z (estimated) · NOTAM 07/863

SVC AUTOMATED WX BCST SYSTEM T/DP/CEILING/PRESENT WX UNREL

!GWO 07/863 CKM SVC AUTOMATED WX BCST SYSTEM T/DP/CEILING/PRESENT WX UNREL 2607300100-2701222359EST

Obstacles · 1 active

Tower lights — unserviceable
Medium

From 14 Sep 2026 2105Z to 12 Jan 2027 2105Z · NOTAM 09/422

OBST TOWER LGT (ASR 1052941) 340910.80N0903219.70W (8.9NM S CKM) 493.4FT (329.7FT AGL) U/S

09/422 NOTAMN<br/>
<b>Q) </b>KZME/QOLAS/IV/M/E/000/005/3417N09030W005<br/>
<b>A) </b>KCKM<br/>
<b>B) </b>2609142105<br/>
<b>C) </b>2701122105<br/> 
<b>E) </b> TOWER LGT (ASR 1052941) 340910.80N0903219.70W (8.9NM S CKM) 493.4FT (329.7FT AGL) U/S<br/>

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KCKM right now?

Fletcher Field has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KCKM

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.