KEDU NOTAMs

Active notices for University (EDU · KEDU), Davis, CA. 2 in force, as of 21 Sep 2026 2244Z. · Open on the map

All of University — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated just now

Obstacles 2

Tower lights — unserviceable
OBST TOWER LGT (ASR UNKNOWN) 383201.40N1214135.30W (5NM ENE EDU) 142FT (111FT AGL) U/S
08/138Active · expires in 63d
Tower lights — unserviceable
OBST TOWER LGT (ASR UNKNOWN) 383201.04N1214135.03W (4.8NM E EDU) 142FT (111FT AGL) U/S
09/074Active · expires in 82d
All 2 active NOTAMs every severity, with windows and raw text

Obstacles · 2 active

Tower lights — unserviceable
Medium

From 24 Aug 2026 1138Z to 23 Nov 2026 2359Z · NOTAM 08/138

OBST TOWER LGT (ASR UNKNOWN) 383201.40N1214135.30W (5NM ENE EDU) 142FT (111FT AGL) U/S

!RIU 08/138 EDU OBST TOWER LGT (ASR UNKNOWN) 383201.40N1214135.30W (5NM ENE EDU) 142FT (111FT AGL) U/S 2608241138-2611232359
Tower lights — unserviceable
Medium

From 13 Sep 2026 1537Z to 12 Dec 2026 2359Z · NOTAM 09/074

OBST TOWER LGT (ASR UNKNOWN) 383201.04N1214135.03W (4.8NM E EDU) 142FT (111FT AGL) U/S

!RIU 09/074 EDU OBST TOWER LGT (ASR UNKNOWN) 383201.04N1214135.03W (4.8NM E EDU) 142FT (111FT AGL) U/S 2609131537-2612122359

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KEDU right now?

University has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KEDU

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.