KEET TAF

Terminal aerodrome forecast for Shelby County (EET · KEET), Alabaster, AL. Issued 20 Sep 2026 2322Z, valid 0000Z to 0000Z, decoded period by period below. · Open on the map

All of Shelby County — runways, frequencies, charts and live weather

TAF issued 20 Sep 2026 2322Z

valid 0000Z to 0000Z
TAF KEET 202322Z 2100/2124 VRB03KT P6SM SCT060 SCT250 FM211500 VRB05KT P6SM BKN250 PROB30 2119/2124 VRB10G20KT 5SM TSRA BR BKN050CB

Times are UTC (Zulu), as they appear in the bulletin.

Period by period

Period (UTC)ChangeWindVisCeilingSkyCat
0000Z to 1500ZInitialVariable at 3 kt6+ SMClearScattered at 6,000 ft AGL, Scattered at 25,000 ft AGLVFR
1500Z to 0000ZFMVariable at 5 kt6+ SM25,000 ft BKNBroken at 25,000 ft AGLVFR
1900Z to 0000ZPROBVariable at 10-20 kt5 SM5,000 ft BKNBroken at 5,000 ft AGLMVFR

What the change groups mean

FM
From — a rapid, permanent change to the conditions that follow.

What the categories mean

VFR
Visual flight rules — ceiling above 3,000 ft and visibility greater than 5 SM.
MVFR
Marginal VFR — ceiling 1,000 to 3,000 ft and/or visibility 3 to 5 SM.

Frequently asked

What is the current TAF for KEET?

The forecast issued 20 Sep 2026 2322Z for Shelby County reads: TAF KEET 202322Z 2100/2124 VRB03KT P6SM SCT060 SCT250 FM211500 VRB05KT P6SM BKN250 PROB30 2119/2124 VRB10G20KT 5SM TSRA BR BKN050CB

How far ahead does a TAF forecast?

A TAF covers a 24-hour period at most airports and 30 hours at larger ones, issued four times a day at 0000Z, 0600Z, 1200Z and 1800Z. It describes conditions within roughly 5 statute miles of the airport, not the surrounding area.

What do FM, BECMG and TEMPO mean?

FM (from) marks a rapid, permanent change at the stated time. BECMG (becoming) marks a gradual change over the stated window. TEMPO marks conditions expected for less than half the period, in spells of under an hour each. PROB30 and PROB40 give the probability of the conditions that follow.

More about KEET

Forecasts from the US National Weather Service Aviation Weather Center. Times are UTC (Zulu). For planning and education only — always confirm with an official preflight briefing.

Something here wrong or out of date? Report a data problem.