KEKA NOTAMs
Active notices for Murray Field (EKA · KEKA), Eureka, CA. 3 in force, as of 6 Aug 2026 0916Z.
All of Murray Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 19h ago
Airport 1
Procedures 1
All 3 active NOTAMs every severity, with windows and raw text
Airport · 1 active
Aerodrome — work in progress
MediumFrom 22 Apr 2026 1329Z to 31 Oct 2026 2359Z · NOTAM 04/294
AD AP ALL SFC WIP GRASS CUTTING
04/294 NOTAMN Q) KZSE/QFAHW/IV/NBO/A/000/999/4048N12406W005 A) KEKA B) 2604221329 C) 2610312359 E) AP ALL SFC WIP GRASS CUTTING
Airspace · 1 active
AIRSPACE SEE FDC 6/0694 ZSE 91.145 AIRSHOW DLY 1830-0130
LowFrom 7 Aug 2026 1830Z to 10 Aug 2026 0130Z · NOTAM 08/001
AIRSPACE SEE FDC 6/0694 ZSE 91.145 AIRSHOW DLY 1830-0130
!OAK 08/001 EKA AIRSPACE SEE FDC 6/0694 ZSE 91.145 AIRSHOW DLY 1830-0130 2608071830-2608100130
Procedures · 1 active
Standard departure — not available
MediumFrom 5 Aug 2026 1606Z to 30 Sep 2026 1606Z · NOTAM 6/2166 · FDC
ODP MURRAY FLD, EUREKA, CA. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 4... DEPARTURE PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FOT VORTAC OUT OF SERVICE. 2608051606-2609301606EST
Q) KZSE/QPDAU/I/NBO/A/000/999/4048N12406W005 A) KEKA B) 2407291610 C) 2503101610EST E) EKA MURRAY FLD, EUREKA, CA. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 4... DEPARTURE PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FOT VORTAC U/S.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KEKA right now?
Murray Field has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KEKA
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.