Ely/Yelland Field charts & airport diagram

Ely/Yelland Field (ELY · KELY) in Ely, NV publishes 8 FAA charts, including 2 instrument approaches (RNAV (GPS), VOR). Every one links straight to the current FAA PDF. · Open on the map

All of Ely/Yelland Field — runways, frequencies, charts and live weather
Airport
Approaches
Departures
Minimums

Lowest minimums here: RNAV (GPS) with vertical guidance · Every chart below links straight to the current FAA PDF.

What KELY publishes

Airport diagram

The FAA airport diagram for Ely/Yelland Field — runways, taxiways, ramps and hold short lines. Shown in the browser above; the FAA PDF ↗ is the authoritative copy.

Instrument approaches at KELY

Ely/Yelland Field has 2 published instrument approaches of 2 types (RNAV (GPS) and VOR). 1 of them offers vertical guidance; RNAV (GPS) gives the lowest minimums. One is circling only — bringing you to the airport rather than a runway, to circle for whichever runway the wind favors at circling minimums.

No published approach to runway 36, 12 and 30: landing on those ends in instrument conditions means a circling approach or a visual after breaking out.

Takeoff, alternate and surface information

  • Takeoff minimums are published for KELY. Standard is 1 statute mile visibility for one and two engine aircraft (½ mile for more than two) unless this section says otherwise; Part 91 operators are not bound by them but the obstacle notes apply to everyone.
  • Ely/Yelland Field has an obstacle departure procedure (ODP): the charted way to clear terrain and obstacles after takeoff in instrument conditions. ATC does not assign it; under Part 91 it is recommended rather than required, and it is what you fly when no SID or radar vectors have been given.
  • Non standard alternate minimums are published: if you file KELY as an IFR alternate, the required forecast is higher than the default 600-2 for precision or 800-2 for non precision approaches. Check the alternate rule tool.
All 8 charts, as a list every plate with its direct FAA link

Airport documents 2

Approaches 2

Frequently asked

Where can I get the KELY airport diagram?

The FAA publishes the Ely/Yelland Field airport diagram as part of the d-TPP (Digital Terminal Procedures Publication), reissued every 28 days. The current one is linked on this page, along with a full-page preview.

Does KELY have an instrument approach?

Yes. Ely/Yelland Field has 2 published instrument approaches: RNAV (GPS), VOR. At least one offers vertical guidance.

What is the lowest approach at KELY?

RNAV (GPS) to runway 18 is the approach type with the lowest published minimums at Ely/Yelland Field. It has vertical guidance, so it is flown to a decision altitude rather than a minimum descent altitude. Actual minimums vary by aircraft category and are on the plate.

Does KELY have an obstacle departure procedure?

Yes. Ely/Yelland Field publishes an ODP. Under Part 91 it is not mandatory in most cases, but it is the charted way to clear terrain and obstacles after takeoff in instrument conditions.

More about KELY

Charts are the FAA d-TPP (d-TPP cycle 2609 (2026, cycle 9)) and Chart Supplement, reissued on the 28-day chart cycle and linked directly from the FAA. For planning and education only; always fly the current chart.

Something here wrong or out of date? Report a data problem.