KGYL NOTAMs

Active notices for Glencoe Municipal (GYL · KGYL), Glencoe, MN. 3 in force, as of 21 Sep 2026 2347Z. · Open on the map

All of Glencoe Municipal — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated just now

Procedures 3

ODP GLENCOE MUNI, GLENCOE, MN
ODP GLENCOE MUNI, GLENCOE, MN. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES ORIG-A... ADD TAKEOFF OBSTACLE NOTE: RWY 13, TEMPORARY CONSTRUCTION EQUIPMENT AT DER, 88FT RIGHT OF CENTERLINE, 20FT AGL/1007FT MSL (2025-AGL-2030-NRA). ADD TAKEOFF OBSTACLE NOTE: RWY 31, TEMPORARY CONSTRUCTION EQUIPMENT BEGINNING 30FT FROM DER, 325FT LEFT OF CENTERLINE, UP TO 20FT AGL/1016FT MSL (2025-AGL-2028/2035/2037/2039/2040/2041/2044/2045/2047/2048-NRA). ALL OTHER DATA REMAINS AS PUBLISHED. 2603271527-2611061527EST
FDC 6/4882Active · expires in 46d (est.)
Instrument approach
IAP GLENCOE MUNI, GLENCOE, MN. RNAV (GPS) RWY 31, AMDT 1A... LPV DA NA. LNAV/VNAV DA NA. TEMPORARY CONST EQUIP 1007FT MSL 660FT FROM RWY 31 AER (2025-AEA-2030-NRA). 2603271527-2611061527EST
FDC 6/4879Active · expires in 46d (est.)
Instrument approach
IAP GLENCOE MUNI, GLENCOE, MN. RNAV (GPS) RWY 13, ORIG-B... LPV DA NA. LNAV/VNAV DA NA. TEMPORARY CONST EQUIP 1010FT MSL 37FT FROM RWY 13 AER (2025-AEA-2028-NRA). 2603271527-2611061527EST
FDC 6/4876Active · expires in 46d (est.)
All 3 active NOTAMs every severity, with windows and raw text

Procedures · 3 active

ODP GLENCOE MUNI, GLENCOE, MN
Medium

From 27 Mar 2026 1527Z to 6 Nov 2026 1527Z (estimated) · NOTAM 6/4882 · FDC

ODP GLENCOE MUNI, GLENCOE, MN. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES ORIG-A... ADD TAKEOFF OBSTACLE NOTE: RWY 13, TEMPORARY CONSTRUCTION EQUIPMENT AT DER, 88FT RIGHT OF CENTERLINE, 20FT AGL/1007FT MSL (2025-AGL-2030-NRA). ADD TAKEOFF OBSTACLE NOTE: RWY 31, TEMPORARY CONSTRUCTION EQUIPMENT BEGINNING 30FT FROM DER, 325FT LEFT OF CENTERLINE, UP TO 20FT AGL/1016FT MSL (2025-AGL-2028/2035/2037/2039/2040/2041/2044/2045/2047/2048-NRA). ALL OTHER DATA REMAINS AS PUBLISHED. 2603271527-2611061527EST

Q) KZMP/undefined/NBO/A/000/999/4445N09404W005
A) KGYL
B) 2603271526
C) 2611061526EST
E) GYL GLENCOE MUNI, GLENCOE, MN.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES ORIG-A...
ADD TAKEOFF OBSTACLE NOTE: RWY 13, TEMPORARY CONSTRUCTION EQUIPMENT AT DER, 88FT RIGHT OF CENTERLINE, 20FT AGL/1007FT MSL (2025-AGL-2030-NRA). ADD TAKEOFF OBSTACLE NOTE: RWY 31, TEMPORARY CONSTRUCTION EQUIPMENT BEGINNING 30FT FROM DER, 325FT LEFT OF CENTERLINE, UP TO 20FT AGL/1016FT MSL (2025-AGL-2028/2035/2037/2039/2040/2041/2044/2045/2047/2048-NRA). ALL OTHER DATA REMAINS AS PUBLISHED.
Instrument approach
Medium

From 27 Mar 2026 1527Z to 6 Nov 2026 1527Z (estimated) · NOTAM 6/4879 · FDC

IAP GLENCOE MUNI, GLENCOE, MN. RNAV (GPS) RWY 31, AMDT 1A... LPV DA NA. LNAV/VNAV DA NA. TEMPORARY CONST EQUIP 1007FT MSL 660FT FROM RWY 31 AER (2025-AEA-2030-NRA). 2603271527-2611061527EST

Q) KZMP/QPIXX/I/NBO/A/000/999/4445N09404W005
A) KGYL
B) 2603271526
C) 2611061525EST
E) GYL GLENCOE MUNI, GLENCOE, MN.
RNAV (GPS) RWY 31, AMDT 1A...
LPV DA NA.
LNAV/VNAV DA NA.
TEMPORARY CONST EQUIP 1007FT MSL 660FT FROM RWY 31 AER (2025-AEA-2030-NRA).
Instrument approach
Medium

From 27 Mar 2026 1527Z to 6 Nov 2026 1527Z (estimated) · NOTAM 6/4876 · FDC

IAP GLENCOE MUNI, GLENCOE, MN. RNAV (GPS) RWY 13, ORIG-B... LPV DA NA. LNAV/VNAV DA NA. TEMPORARY CONST EQUIP 1010FT MSL 37FT FROM RWY 13 AER (2025-AEA-2028-NRA). 2603271527-2611061527EST

Q) KZMP/QPIXX/I/NBO/A/000/999/4445N09404W005
A) KGYL
B) 2603271525
C) 2611061524EST
E) GYL GLENCOE MUNI, GLENCOE, MN.
RNAV (GPS) RWY 13, ORIG-B...
LPV DA NA.
LNAV/VNAV DA NA.
TEMPORARY CONST EQUIP 1010FT MSL 37FT FROM RWY 13 AER (2025-AEA-2028-NRA).

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KGYL right now?

Glencoe Municipal has 3 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KGYL

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.