KHKA NOTAMs

Active notices for Blytheville Municipal (HKA · KHKA), Blytheville, AR. 2 in force, as of 5 Nov 2026 0729Z. · Open on the map

All of Blytheville Municipal — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 2 min ago

Obstacles 2

Stack lights — unserviceable
Stack lights are out of service: 491 ft MSL (231 ft AGL), 5.0 NM east of HKA, at 355617N0894338W (ASN 2024-ASW-8304-OE).
FAA text
OBST STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S
10/001Active · expires in 14d
Tower lights — unserviceable
Tower lights are out of service: 488 ft MSL (229 ft AGL), 3.3 NM southeast of HKA, at 355355N0894708W (ASN 2024-ASW-8306-OE).
FAA text
OBST TOWER LGT (ASN 2024-ASW-8306-OE) 355355N0894708W (3.3NM SE HKA) 488FT (229FT AGL) U/S
11/001Active · expires in 42d
All 2 active NOTAMs every severity, with windows and raw text

Obstacles · 2 active

Stack lights — unserviceable
Medium

From 5 Oct 2026 0510Z to 19 Nov 2026 0607Z · NOTAM 10/001

OBST STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S

!HKA 10/001 HKA OBST STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S 2610050510-2611190607
Tower lights — unserviceable
Medium

From 2 Nov 2026 1511Z to 17 Dec 2026 1511Z · NOTAM 11/001

OBST TOWER LGT (ASN 2024-ASW-8306-OE) 355355N0894708W (3.3NM SE HKA) 488FT (229FT AGL) U/S

!HKA 11/001 HKA OBST TOWER LGT (ASN 2024-ASW-8306-OE) 355355N0894708W (3.3NM SE HKA) 488FT (229FT AGL) U/S 2611021511-2612171511

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KHKA right now?

Blytheville Municipal has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KHKA

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.