KHKA NOTAMs

Active notices for Blytheville Municipal (HKA · KHKA), Blytheville, AR. 2 in force, as of 21 Sep 2026 0538Z. · Open on the map

All of Blytheville Municipal — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 2 min ago

Obstacles 2

Tower lights — unserviceable
OBST TOWER LGT (ASR 1047488) 355356.00N0895248.00W (3.5NM SW HKA) 748.7FT (503.6FT AGL) U/S
04/001Active · expires in 11d
Stack lights — unserviceable
OBST STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S
08/002Active · expires in 16d
All 2 active NOTAMs every severity, with windows and raw text

Obstacles · 2 active

Tower lights — unserviceable
Medium

From 6 Apr 2026 1202Z to 1 Oct 2026 2359Z · NOTAM 04/001

OBST TOWER LGT (ASR 1047488) 355356.00N0895248.00W (3.5NM SW HKA) 748.7FT (503.6FT AGL) U/S

04/001 NOTAMN<BR>
<B>Q) </B>KZME/QOLAS/IV/M/AE/000/008/3556N08949W005<BR>
<B>A) </B>KHKA<BR>
<B>B) </B>2604061202<BR>
<B>C) </B>2610012359<BR> 
<B>E) </B> TOWER LGT (ASR 1047488) 355356.00N0895248.00W (3.5NM SW HKA) 748.7FT (503.6FT AGL) U/S<BR>
Stack lights — unserviceable
Medium

From 23 Aug 2026 0604Z to 7 Oct 2026 0607Z · NOTAM 08/002

OBST STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S

08/002 NOTAMN<BR>
<B>Q) </B>KZME/QOLAS/IV/M/AE/000/005/3556N08949W005<BR>
<B>A) </B>KHKA<BR>
<B>B) </B>2608230604<BR>
<B>C) </B>2610070607<BR> 
<B>E) </B> STACK LGT (ASN 2024-ASW-8304-OE) 355617N0894338W (5.0NM E HKA) 491FT (231FT AGL) U/S<BR>

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KHKA right now?

Blytheville Municipal has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KHKA

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.