KLWV NOTAMs
Active notices for Lawrenceville-Vincennes International (LWV · KLWV), Lawrenceville, IL. 7 in force, as of 5 Nov 2026 1005Z. · Open on the map
All of Lawrenceville-Vincennes International — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Approach & navaids 1
FAA text
Obstacles 3
FAA text
FAA text
FAA text
Procedures 3
All 7 active NOTAMs every severity, with windows and raw text
Approach & navaids · 1 active
Air/ground facility — unserviceable
MediumFrom 4 Nov 2026 1608Z to 18 Nov 2026 2000Z (estimated) · NOTAM 11/001
COM REMOTE TRANS/REC U/S
!LWV 11/001 LWV COM REMOTE TRANS/REC U/S 2611041608-2611182000EST
Obstacles · 3 active
Tower lights — unserviceable
MediumFrom 7 Oct 2026 0017Z to 21 Nov 2026 0017Z · NOTAM 10/002
OBST TOWER LGT (ASR 1062268) 383956.70N0872710.20W (9.3NM SE LWV) 1043FT (483FT AGL) U/S
!LWV 10/002 LWV OBST TOWER LGT (ASR 1062268) 383956.70N0872710.20W (9.3NM SE LWV) 1043FT (483FT AGL) U/S 2610070017-2611210017
Tower lights — unserviceable
MediumFrom 3 Sep 2026 0732Z to 2 Dec 2026 0832Z · NOTAM 09/001
OBST TOWER LGT (ASR 1028908) 384033.00N0872748.20W (8.5NM SE LWV) 823.8FT (297.9FT AGL) U/S
!LWV 09/001 LWV OBST TOWER LGT (ASR 1028908) 384033.00N0872748.20W (8.5NM SE LWV) 823.8FT (297.9FT AGL) U/S 2609030732-2612020832
Tower lights — unserviceable
MediumFrom 8 Sep 2026 1634Z to 7 Dec 2026 1734Z · NOTAM 09/002
OBST TOWER LGT (ASR 1227724) 384005.20N0873151.50W (6.7NM SSE LWV) 612.9FT (194.9FT AGL) U/S
!LWV 09/002 LWV OBST TOWER LGT (ASR 1227724) 384005.20N0873151.50W (6.7NM SSE LWV) 612.9FT (194.9FT AGL) U/S 2609081634-2612071734
Procedures · 3 active
Approach RNAV (GPS) RWY 36 not available
MediumFrom 12 May 2025 1903Z to 13 May 2027 1902Z (estimated) · NOTAM 5/9555 · FDC
IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 36, AMDT 1C... RWY 36 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. 2505121903-2705131902EST
!FDC 5/9555 LWV IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 36, AMDT 1C... RWY 36 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. 2505121903-2705131902EST
Approach RNAV (GPS) RWY 27 not available
MediumFrom 12 May 2025 1903Z to 13 May 2027 1903Z (estimated) · NOTAM 5/9557 · FDC
IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 27, AMDT 1C... RWY 27 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. CHANGE NOTE TO READ: INOP TABLE DOES NOT APPLY TO LPV ALL CATS AND LNAV CATS C AND D. 2505121903-2705131903EST
!FDC 5/9557 LWV IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 27, AMDT 1C... RWY 27 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. CHANGE NOTE TO READ: INOP TABLE DOES NOT APPLY TO LPV ALL CATS AND LNAV CATS C AND D. 2505121903-2705131903EST
Approach RNAV (GPS) RWY 9 changed
MediumFrom 4 Dec 2025 1721Z to 4 Dec 2027 1720Z (estimated) · NOTAM 5/4683 · FDC
IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 9, AMDT 1C... LNAV MDA 840/HAT 412 ALL CATS. 2512041721-2712041720EST
!FDC 5/4683 LWV IAP LAWRENCEVILLE-VINCENNES INTL, LAWRENCEVILLE, IL. RNAV (GPS) RWY 9, AMDT 1C... LNAV MDA 840/HAT 412 ALL CATS. 2512041721-2712041720EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KLWV right now?
Lawrenceville-Vincennes International has 7 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KLWV
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.