KPMZ NOTAMs
Active notices for Plymouth Municipal Airport (PMZ · KPMZ), Plymouth, NC. 2 in force, as of 6 Aug 2026 0916Z.
All of Plymouth Municipal Airport — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 17h ago
Obstacles 1
Procedures 1
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 1 active
OBST TOWER LGT (ASR 1005005) 355131.00N0764413.00W (3.1NM NNE PMZ) 258.2FT (243.1FT AGL) U
MediumFrom 3 Aug 2026 1715Z to 3 Oct 2026 2222Z · NOTAM 08/027
OBST TOWER LGT (ASR 1005005) 355131.00N0764413.00W (3.1NM NNE PMZ) 258.2FT (243.1FT AGL) U/S
08/027 NOTAMN<BR> <B>Q) </B>KZDC/QOLAS/IV/M/AE/000/003/3548N07645W005<BR> <B>A) </B>KPMZ<BR> <B>B) </B>2608031715<BR> <B>C) </B>2610032222<BR> <B>E) </B> TOWER LGT (ASR 1005005) 355131.00N0764413.00W (3.1NM NNE PMZ) 258.2FT (243.1FT AGL) U/S<BR>
Procedures · 1 active
Standard departure — changed
MediumFrom 14 Jul 2026 1826Z to 14 Jul 2028 1826Z (estimated) · NOTAM 6/5662 · FDC
ODP PLYMOUTH MUNI, PLYMOUTH, NC. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKEOFF MINIMUMS: RWY 03: 400-2 OR STANDARD WITH MINIMUM CLIMB OF 276 FT/NM TO 500. ALL OTHER DATA REMAINS AS PUBLISHED. 2607141826-2807141826EST
Q) KZDC/QPDCH/I/NBO/A/000/999/3548N07645W005 A) KPMZ B) 2607141807 C) 2702231807EST E) PMZ PLYMOUTH MUNI, PLYMOUTH, NC. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKEOFF MINIMUMS: RWY 03: 400-2 OR STANDARD WITH MINIMUM CLIMB OF 276 FT/NM TO 500. ALL OTHER DATA REMAINS AS PUBLISHED.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KPMZ right now?
Plymouth Municipal Airport has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KPMZ
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.