KPMZ NOTAMs

Active notices for Plymouth Municipal (PMZ · KPMZ), Plymouth, NC. 1 in force, as of 5 Nov 2026 0732Z. · Open on the map

All of Plymouth Municipal — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 1 min ago

Procedures 1

Takeoff minimums and obstacle departure procedures changed
ODP PLYMOUTH MUNI, PLYMOUTH, NC. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKEOFF MINIMUMS: RWY 03: 400-2 OR STANDARD WITH MINIMUM CLIMB OF 276 FT/NM TO 500. ALL OTHER DATA REMAINS AS PUBLISHED. 2607141826-2807141826EST
FDC 6/5662Active · expires in 617d (est.)
All 1 active NOTAM every severity, with windows and raw text

Procedures · 1 active

Takeoff minimums and obstacle departure procedures changed
Medium

From 14 Jul 2026 1826Z to 14 Jul 2028 1826Z (estimated) · NOTAM 6/5662 · FDC

ODP PLYMOUTH MUNI, PLYMOUTH, NC. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2... TAKEOFF MINIMUMS: RWY 03: 400-2 OR STANDARD WITH MINIMUM CLIMB OF 276 FT/NM TO 500. ALL OTHER DATA REMAINS AS PUBLISHED. 2607141826-2807141826EST

!FDC 6/5662 PMZ ODP PLYMOUTH MUNI, PLYMOUTH, NC.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2...
TAKEOFF MINIMUMS: RWY 03: 400-2 OR STANDARD WITH MINIMUM CLIMB OF 276 FT/NM TO 500.
ALL OTHER DATA REMAINS AS PUBLISHED. 2607141826-2807141826EST

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KPMZ right now?

Plymouth Municipal has 1 active NOTAM.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KPMZ

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.