KPVC NOTAMs
Active notices for Provincetown Municipal (PVC · KPVC), Provincetown, MA. 1 in force, as of 21 Sep 2026 0541Z. · Open on the map
All of Provincetown Municipal — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated just now
Procedures 1
All 1 active NOTAM every severity, with windows and raw text
Procedures · 1 active
Instrument approach — operational
MediumFrom 21 Sep 2026 1300Z to 28 Sep 2026 1827Z (estimated) · NOTAM 6/3970 · FDC
IAP PROVINCETOWN MUNI, PROVINCETOWN, MA. ILS OR LOC RWY 7, AMDT 9B... DME REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, LFV VOR/DME OUT OF SERVICE. 2609211300-2609281827EST
Q) KZBW/QPIAO/I/NBO/A/000/999/4204N07013W005 A) KPVC B) 2605200105 C) 2612300105EST E) PVC PROVINCETOWN MUNI, PROVINCETOWN, MA. ILS OR LOC RWY 7, AMDT 9B... DME REQUIRED EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, LFV VOR/DME U/S.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KPVC right now?
Provincetown Municipal has 1 active NOTAM.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KPVC
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.