KSUD NOTAMs
Active notices for Stroud Municipal (SUD · KSUD), Stroud, OK. 3 in force, as of 21 Sep 2026 0541Z. · Open on the map
All of Stroud Municipal — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Runway 1
Taxiway 1
Obstacles 1
All 3 active NOTAMs every severity, with windows and raw text
Runway · 1 active
Runway 18/36 — closed
HighFrom 9 Mar 2026 1200Z to 25 Sep 2026 1300Z · NOTAM 03/080
RWY 18/36 CLSD
!MLC 03/080 SUD RWY 18/36 CLSD 2603091200-2609251300
Taxiway · 1 active
TWY PARL TWY ADJ RWY 18/36 CLSD
MediumFrom 25 May 2026 1200Z to 25 Sep 2026 1300Z · NOTAM 05/262
TWY PARL TWY ADJ RWY 18/36 CLSD
!MLC 05/262 SUD TWY PARL TWY ADJ RWY 18/36 CLSD 2605251200-2609251300
Obstacles · 1 active
Wind turbine lights — unserviceable
MediumFrom 7 Sep 2026 0536Z to 22 Oct 2026 0603Z · NOTAM 09/047
OBST WIND TURBINE LGT (ASN 2021-WTW-7758-OE) 355100N0963816W (3.7NM NNE SUD) 1264FT (265FT AGL) U/S
09/047 NOTAMN<BR> <B>Q) </B>KZKC/QOLAS/IV/M/AE/000/013/3547N09639W005<BR> <B>A) </B>KSUD<BR> <B>B) </B>2609070536<BR> <B>C) </B>2610220603<BR> <B>E) </B> WIND TURBINE LGT (ASN 2021-WTW-7758-OE) 355100N0963816W (3.7NM NNE SUD) 1264FT (265FT AGL) U/S<BR>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KSUD right now?
Stroud Municipal has 3 active NOTAMs, 1 of them affecting runways, 1 of high significance.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KSUD
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.