KTDO NOTAMs
Active notices for Ed Carlson Memorial Field/South Lewis County (TDO · KTDO), Toledo, WA. 1 in force, as of 5 Nov 2026 1847Z. · Open on the map
All of Ed Carlson Memorial Field/South Lewis County — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Procedures 1
All 1 active NOTAM every severity, with windows and raw text
Procedures · 1 active
Approach RNAV (GPS) RWY 6 not available
MediumFrom 10 Sep 2025 1147Z to 10 Sep 2027 2359Z (estimated) · NOTAM 5/0958 · FDC
IAP ED CARLSON MEML FLD/SOUTH LEWIS COUNTY, TOLEDO, WA. RNAV (GPS) RWY 6, ORIG-A... LPV DA NA ALL CATS. LNAV/VNAV DA NA ALL CATS. LNAV MDA 860/HAT 493 ALL CATS. CIRCLING CAT C MDA 1100/HAA 726. LNAV CAT C VIS 1 3/8. CHANGE HELO NOTE TO READ: RWY 6 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. 2509101147-2709102359EST
!FDC 5/0958 TDO IAP ED CARLSON MEML FLD/SOUTH LEWIS COUNTY, TOLEDO, WA. RNAV (GPS) RWY 6, ORIG-A... LPV DA NA ALL CATS. LNAV/VNAV DA NA ALL CATS. LNAV MDA 860/HAT 493 ALL CATS. CIRCLING CAT C MDA 1100/HAA 726. LNAV CAT C VIS 1 3/8. CHANGE HELO NOTE TO READ: RWY 6 HELICOPTER VISIBILITY REDUCTION BELOW 3/4 SM NOT AUTHORIZED. 2509101147-2709102359EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KTDO right now?
Ed Carlson Memorial Field/South Lewis County has 1 active NOTAM.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KTDO
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.