L35 NOTAMs

Active notices for Big Bear City Airport (L35 · RBF), Big Bear, CA. 2 in force, as of 2 Sep 2026 0332Z. · Open on the map

All of Big Bear City Airport — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 3 min ago

Obstacles 1

Tower lights — unserviceable
OBST TOWER LGT (ASR 1054278) 341543.00N1165122.00W (0.1NM S L35) 6825.1FT (78.1FT AGL) U/S
08/106Active · expires in 38d
All 2 active NOTAMs every severity, with windows and raw text

Airspace · 1 active

Numerous unmanned aircraft
Low

From 5 Sep 2026 2100Z to 7 Sep 2026 0530Z · NOTAM 08/125

AIRSPACE NUMEROUS UAS WI AN AREA DEFINED AS .25NM RADIUS OF 341450N1165438W (2.9NM SW L35) SFC-400FT AGL DLY 2100-0530

!RAL 08/125 L35 AIRSPACE NUMEROUS UAS WI AN AREA DEFINED AS .25NM RADIUS OF 341450N1165438W (2.9NM SW L35) SFC-400FT AGL DLY 2100-0530 2609052100-2609070530

Obstacles · 1 active

Tower lights — unserviceable
Medium

From 26 Aug 2026 1000Z to 10 Oct 2026 0959Z · NOTAM 08/106

OBST TOWER LGT (ASR 1054278) 341543.00N1165122.00W (0.1NM S L35) 6825.1FT (78.1FT AGL) U/S

!RAL 08/106 L35 OBST TOWER LGT (ASR 1054278) 341543.00N1165122.00W (0.1NM S L35) 6825.1FT (78.1FT AGL) U/S 2608261000-2610100959

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at L35 right now?

Big Bear City Airport has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about L35

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.