M94 NOTAMs
Active notices for Desert Aire Regional (M94), Mattawa, WA. 3 in force, as of 19 Sep 2026 0117Z. · Open on the map
All of Desert Aire Regional — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Obstacles 3
All 3 active NOTAMs every severity, with windows and raw text
Obstacles · 3 active
Tower lights — unserviceable
MediumFrom 9 Jul 2026 0225Z to 7 Oct 2026 0225Z · NOTAM 07/116
OBST TOWER LGT (ASR 1238766) 465637.60N1200448.00W (16.8NM NNW M94) 1911.1FT (250.0FT AGL) U/S
07/116 NOTAMN<br/> <b>Q) </b>KZSE/QOLAS/IV/M/E/000/020/4641N11955W005<br/> <b>A) </b>M94<br/> <b>B) </b>2607090225<br/> <b>C) </b>2610070225<br/> <b>E) </b> TOWER LGT (ASR 1238766) 465637.60N1200448.00W (16.8NM NNW M94) 1911.1FT (250.0FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 14 Aug 2026 2132Z to 14 Oct 2026 2359Z · NOTAM 08/230
OBST TOWER LGT (ASR 1249697) 463645.70N1195034.40W (5.5NM SE M94) 2394.7FT (159.8FT AGL) U/S
08/230 NOTAMN<BR> <B>Q) </B>KZSE/QOLAS/IV/M/E/000/024/4641N11955W005<BR> <B>A) </B> <BR> <B>B) </B>2608142132<BR> <B>C) </B>2610142359<BR> <B>E) </B> TOWER LGT (ASR 1249697) 463645.70N1195034.40W (5.5NM SE M94) 2394.7FT (159.8FT AGL) U/S<BR>
Power line lights — unserviceable
MediumFrom 1 Sep 2026 1108Z to 28 Nov 2026 2359Z · NOTAM 09/006
OBST POWER LINE LGT (ASN 2018-ANM-4742-OE) 465150N1195732W (10.8NM N M94) 723FT (200FT AGL) U/S
09/006 NOTAMN<BR> <B>Q) </B>KZSE/QOLAS/IV/M/E/000/008/4641N11955W005<BR> <B>A) </B> <BR> <B>B) </B>2609011108<BR> <B>C) </B>2611282359<BR> <B>E) </B> POWER LINE LGT (ASN 2018-ANM-4742-OE) 465150N1195732W (10.8NM N M94) 723FT (200FT AGL) U/S<BR>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at M94 right now?
Desert Aire Regional has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about M94
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.