PAFE NOTAMs

Active notices for Kake (AFE · PAFE), Kake, AK. 3 in force, as of 5 Nov 2026 0547Z. · Open on the map

All of Kake — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 3 min ago

Airport 1

Weather service — not available
Automated weather broadcast system visibility is out of service.
FAA text
SVC AUTOMATED WX BCST SYSTEM VIS U/S
10/003Active · expires in 17d (est.)

Procedures 1

Takeoff minimums and obstacle departure procedures changed
Obstacle departure (ODP), KAKE, KAKE, AK. Applies to KAKE ONE DEPARTURE (RNAV). The PBN requirements note is changed to read: RNAV 1 - GPS. All other data remains as published.
Reworded by AI and checked against the FAA text. The FAA text governs.
FAA text
ODP KAKE, KAKE, AK. KAKE ONE DEPARTURE (RNAV) ... CHANGE PBN REQUIREMENTS NOTE TO READ: RNAV 1 - GPS. ALL OTHER DATA REMAINS AS PUBLISHED. 2610011951-2705131951EST
FDC 6/6688Active · expires in 190d (est.)
All 3 active NOTAMs every severity, with windows and raw text

Airport · 2 active

Weather service — not available
Medium

From 31 Oct 2026 1713Z to 22 Nov 2026 1500Z (estimated) · NOTAM 10/003

SVC AUTOMATED WX BCST SYSTEM VIS U/S

!AFE 10/003 AFE SVC AUTOMATED WX BCST SYSTEM VIS U/S 2610311713-2611221500EST
Weather service — not available
Low

From 31 Oct 2026 1708Z to 22 Nov 2026 1500Z (estimated) · NOTAM 10/002

SVC AUTOMATED WX BCST SYSTEM NOT AVBL

!AFE 10/002 AFE SVC AUTOMATED WX BCST SYSTEM NOT AVBL 2610311708-2611221500EST

Procedures · 1 active

Takeoff minimums and obstacle departure procedures changed
Medium

From 1 Oct 2026 1951Z to 13 May 2027 1951Z (estimated) · NOTAM 6/6688 · FDC

ODP KAKE, KAKE, AK. KAKE ONE DEPARTURE (RNAV) ... CHANGE PBN REQUIREMENTS NOTE TO READ: RNAV 1 - GPS. ALL OTHER DATA REMAINS AS PUBLISHED. 2610011951-2705131951EST

!FDC 6/6688 AFE ODP KAKE, KAKE, AK.
KAKE ONE DEPARTURE (RNAV) ...
CHANGE PBN REQUIREMENTS NOTE TO READ: RNAV 1 - GPS.
ALL OTHER DATA REMAINS AS PUBLISHED. 2610011951-2705131951EST

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at PAFE right now?

Kake has 3 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about PAFE

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.