Shungnak charts & airport diagram
Shungnak (SHG · PAGH) in Shungnak, AK publishes 6 FAA charts, including 2 instrument approaches (RNAV (GPS)). Every one links straight to the current FAA PDF. · Open on the map
All of Shungnak — runways, frequencies, charts and live weatherLowest minimums here: RNAV (GPS) with vertical guidance · Every chart below links straight to the current FAA PDF.
What PAGH publishes
Instrument approaches at PAGH
Shungnak has 2 published instrument approaches of 1 type (RNAV (GPS)). 2 of them offer vertical guidance; RNAV (GPS) gives the lowest minimums.
Takeoff, alternate and surface information
- Takeoff minimums are published for PAGH. Standard is 1 statute mile visibility for one and two engine aircraft (½ mile for more than two) unless this section says otherwise; Part 91 operators are not bound by them but the obstacle notes apply to everyone.
- Shungnak has an obstacle departure procedure (ODP): the charted way to clear terrain and obstacles after takeoff in instrument conditions. ATC does not assign it; under Part 91 it is recommended rather than required, and it is what you fly when no SID or radar vectors have been given.
- Non standard alternate minimums are published: if you file PAGH as an IFR alternate, the required forecast is higher than the default 600-2 for precision or 800-2 for non precision approaches. Check the alternate rule tool.
All 6 charts, as a list every plate with its direct FAA link
Frequently asked
Does PAGH have an instrument approach?
Yes. Shungnak has 2 published instrument approaches: RNAV (GPS). At least one offers vertical guidance.
What is the lowest approach at PAGH?
RNAV (GPS) to runway 10 is the approach type with the lowest published minimums at Shungnak. It has vertical guidance, so it is flown to a decision altitude rather than a minimum descent altitude. Actual minimums vary by aircraft category and are on the plate.
Does PAGH have an obstacle departure procedure?
Yes. Shungnak publishes an ODP. Under Part 91 it is not mandatory in most cases, but it is the charted way to clear terrain and obstacles after takeoff in instrument conditions.
More about PAGH
Charts are the FAA d-TPP (d-TPP cycle 2609 (2026, cycle 9)) and Chart Supplement, reissued on the 28-day chart cycle and linked directly from the FAA. For planning and education only; always fly the current chart.
Something here wrong or out of date? Report a data problem.