PAKK NOTAMs

Active notices for Koyuk Alfred Adams (KKA · PAKK), Koyuk, AK. 3 in force, as of 5 Nov 2026 0729Z. · Open on the map

All of Koyuk Alfred Adams — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 1 min ago

Lighting 2

Runway 19 — VASI unserviceable
Runway 19 VASI is out of service.
FAA text
RWY 19 VASI U/S
10/003Active · expires in 51d (est.)
Runway 19 — pilot-controlled lighting unserviceable
PCL runway 19 VASI is out of service except low intensity on continuous.
FAA text
SVC PCL RWY 19 VASI U/S EXC LOW INTST ON CONS
10/001Active · expires in 52d (est.)
All 3 active NOTAMs every severity, with windows and raw text

Airport · 1 active

Weather service — not available
Low

From 3 Nov 2026 1759Z to 27 Nov 2026 1500Z (estimated) · NOTAM 11/014

SVC AUTOMATED WX BCST SYSTEM NOT AVBL

!KKA 11/014 KKA SVC AUTOMATED WX BCST SYSTEM NOT AVBL 2611031759-2611271500EST

Lighting · 2 active

Runway 19 — VASI unserviceable
Medium

From 15 Oct 2026 2044Z to 26 Dec 2026 1500Z (estimated) · NOTAM 10/003

RWY 19 VASI U/S

!KKA 10/003 KKA RWY 19 VASI U/S 2610152044-2612261500EST
Runway 19 — pilot-controlled lighting unserviceable
Medium

From 9 Oct 2026 2228Z to 27 Dec 2026 1500Z (estimated) · NOTAM 10/001

SVC PCL RWY 19 VASI U/S EXC LOW INTST ON CONS

!KKA 10/001 KKA SVC PCL RWY 19 VASI U/S EXC LOW INTST ON CONS 2610092228-2612271500EST

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at PAKK right now?

Koyuk Alfred Adams has 3 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about PAKK

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.