PFKW NOTAMs
Active notices for Kwethluk (KWT · PFKW), Kwethluk, AK. 4 in force, as of 21 Sep 2026 0520Z. · Open on the map
All of Kwethluk — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Lighting 2
Procedures 1
All 4 active NOTAMs every severity, with windows and raw text
Airport · 1 active
Weather service — not available
LowFrom 3 Sep 2026 0438Z to 10 Oct 2026 1500Z (estimated) · NOTAM 09/001
SVC AUTOMATED WX BCST SYSTEM NOT AVBL
09/001 NOTAMR Q)ZAN/QFMXX/IV/BO/A/000/999/6047N16126W005 A) PFKW B) 2609030438 C) 2610101500EST E) AUTOMATED WX BCST SYSTEM NOT AVBL
Lighting · 2 active
Runway 36 — unserviceable
MediumFrom 25 Jul 2026 0911Z to 27 Sep 2026 1500Z (estimated) · NOTAM 07/004
RWY 36 RWY END ID LGT U/S
!KWT 07/004 KWT RWY 36 RWY END ID LGT U/S 2607250911-2609271500EST
Runway 18 — unserviceable
MediumFrom 25 Jul 2026 0915Z to 27 Sep 2026 1500Z (estimated) · NOTAM 07/005
RWY 18 RWY END ID LGT U/S
07/005 NOTAMR Q) PAZA/QLIAS/IV/BO/A/000/999/6047N16126W005 A) PFKW B) 2607250915 C) 2609271500EST E) RWY 18 RWY END ID LGT U/S
Procedures · 1 active
Instrument approach
MediumFrom 19 Feb 2026 1245Z to 19 Feb 2028 1244Z (estimated) · NOTAM 6/6523 · FDC
IAP KWETHLUK, KWETHLUK, AK. RNAV (GPS) RWY 36, ORIG-B... LNAV CAT C VISIBILITY 1 3/4. 2602191245-2802191244EST
Q) PAZA/QPIXX/I/NBO/A/000/999/6047N16126W005 A) PFKW B) 2602191245 C) 2802191244EST E) KWT KWETHLUK, KWETHLUK, AK. RNAV (GPS) RWY 36, ORIG-B... LNAV CAT C VISIBILITY 1 3/4.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at PFKW right now?
Kwethluk has 4 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about PFKW
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.