T30 NOTAMs
Active notices for Mc Kinley Field (T30), Pearsall, TX. 2 in force, as of 18 Sep 2026 1917Z. · Open on the map
All of Mc Kinley Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 21 Aug 2026 0810Z to 19 Nov 2026 0910Z · NOTAM 08/224
OBST TOWER LGT (ASR 1049657) 285453.40N0990155.90W (6.9NM NE T30) 1149.9FT (499.0FT AGL) U/S
08/224 NOTAMN<br/> <b>Q) </b>KZHU/QOLAS/IV/M/E/000/012/2849N09906W005<br/> <b>A) </b>T30<br/> <b>B) </b>2608210810<br/> <b>C) </b>2611190910<br/> <b>E) </b> TOWER LGT (ASR 1049657) 285453.40N0990155.90W (6.9NM NE T30) 1149.9FT (499.0FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 27 Aug 2026 1143Z to 26 Nov 2026 0400Z · NOTAM 08/297
OBST TOWER LGT (ASR 1249423) 285858.20N0991608.10W (12.8NM NW T30) 909.8FT (305.8FT AGL) U/S
08/297 NOTAMN<br/> <b>Q) </b>KZHU/QOLAS/IV/M/E/000/010/2849N09906W005<br/> <b>A) </b>T30<br/> <b>B) </b>2608271143<br/> <b>C) </b>2611260400<br/> <b>E) </b> TOWER LGT (ASR 1249423) 285858.20N0991608.10W (12.8NM NW T30) 909.8FT (305.8FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at T30 right now?
Mc Kinley Field has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about T30
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.