02D NOTAMs
Active notices for Winona Lake (02D), Winona Lake, IN. 2 in force, as of 21 Sep 2026 1950Z. · Open on the map
All of Winona Lake — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 9 Aug 2026 2231Z to 7 Nov 2026 2331Z · NOTAM 08/249
OBST TOWER LGT (ASR 1023482) 411122.40N0854642.50W (3.1NM SE 02D) 1313.0FT (430.1FT AGL) U/S
08/249 NOTAMN<br/> <b>Q) </b>KZAU/QOLAS/IV/M/AE/000/014/4113N08549W005<br/> <b>A) </b>02D<br/> <b>B) </b>2608092231<br/> <b>C) </b>2611072331<br/> <b>E) </b> TOWER LGT (ASR 1023482) 411122.40N0854642.50W (3.1NM SE 02D) 1313.0FT (430.1FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 17 Aug 2026 0201Z to 15 Dec 2026 0201Z · NOTAM 08/609
OBST TOWER LGT (ASR 1222206) 411302.80N0854633.70W (2.5NM E 02D) 1109.9FT (253.9FT AGL) U/S
08/609 NOTAMN<br/> <b>Q) </b>KZAU/QOLAS/IV/M/AE/000/012/4113N08549W005<br/> <b>A) </b>02D<br/> <b>B) </b>2608170201<br/> <b>C) </b>2612150201<br/> <b>E) </b> TOWER LGT (ASR 1222206) 411302.80N0854633.70W (2.5NM E 02D) 1109.9FT (253.9FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 02D right now?
Winona Lake has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 02D
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.