6Y9 NOTAMs

Active notices for Prickett-Grooms Field (6Y9), Sidnaw, MI. 2 in force, as of 18 Sep 2026 1432Z. · Open on the map

All of Prickett-Grooms Field — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 2 min ago

Obstacles 2

Tower lights — unserviceable
OBST TOWER LGT (ASR 1278992) 462916.30N0885733.30W (10.5NM W 6Y9) 1453.7FT (278.9FT AGL) U/S
09/224Active · expires in 15d
Tower lights — unserviceable
OBST TOWER LGT (ASR 1000201) 464036.60N0882209.30W (17.1NM NE 6Y9) 2226.0FT (416.0FT AGL) U/S
09/169Active · expires in 114d
All 2 active NOTAMs every severity, with windows and raw text

Obstacles · 2 active

Tower lights — unserviceable
Medium

From 18 Sep 2026 0422Z to 3 Oct 2026 0322Z · NOTAM 09/224

OBST TOWER LGT (ASR 1278992) 462916.30N0885733.30W (10.5NM W 6Y9) 1453.7FT (278.9FT AGL) U/S

!GRB 09/224 6Y9 OBST TOWER LGT (ASR 1278992) 462916.30N0885733.30W (10.5NM W 6Y9) 1453.7FT (278.9FT AGL) U/S 2609180422-2610030322
Tower lights — unserviceable
Medium

From 13 Sep 2026 0032Z to 11 Jan 2027 0032Z · NOTAM 09/169

OBST TOWER LGT (ASR 1000201) 464036.60N0882209.30W (17.1NM NE 6Y9) 2226.0FT (416.0FT AGL) U/S

09/169 NOTAMN<br/>
<b>Q) </b>KZMP/QOLAS/IV/M/E/000/023/4630N08842W005<br/>
<b>A) </b>6Y9<br/>
<b>B) </b>2609130032<br/>
<b>C) </b>2701110032<br/> 
<b>E) </b> TOWER LGT (ASR 1000201) 464036.60N0882209.30W (17.1NM NE 6Y9) 2226.0FT (416.0FT AGL) U/S<br/>

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at 6Y9 right now?

Prickett-Grooms Field has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about 6Y9

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.