80T NOTAMs
Active notices for Quincy Municipal (80T), Quincy, WA. 2 in force, as of 18 Sep 2026 1008Z. · Open on the map
All of Quincy Municipal — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 16 Aug 2026 1827Z to 14 Nov 2026 1927Z · NOTAM 08/247
OBST TOWER LGT (ASR 1246500) 470628.30N1193552.80W (11.6NM ESE 80T) 1496.1FT (303.1FT AGL) U/S
08/247 NOTAMN<br/> <b>Q) </b>KZSE/QOLAS/IV/M/E/000/015/4712N11950W005<br/> <b>A) </b>80T<br/> <b>B) </b>2608161827<br/> <b>C) </b>2611141927<br/> <b>E) </b> TOWER LGT (ASR 1246500) 470628.30N1193552.80W (11.6NM ESE 80T) 1496.1FT (303.1FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 24 Aug 2026 1131Z to 23 Nov 2026 0400Z · NOTAM 08/341
OBST TOWER LGT (ASR 1209566) 470639.90N1194916.30W (6.1NM S 80T) 1483.9FT (255.9FT AGL) U/S
08/341 NOTAMN<br/> <b>Q) </b>KZSE/QOLAS/IV/M/E/000/015/4712N11950W005<br/> <b>A) </b>80T<br/> <b>B) </b>2608241131<br/> <b>C) </b>2611230400<br/> <b>E) </b> TOWER LGT (ASR 1209566) 470639.90N1194916.30W (6.1NM S 80T) 1483.9FT (255.9FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 80T right now?
Quincy Municipal has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 80T
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.