84Y NOTAMs
Active notices for Bloomfield Municipal (84Y), Bloomfield, NE. 2 in force, as of 18 Sep 2026 1944Z. · Open on the map
All of Bloomfield Municipal — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 18 Sep 2026 0031Z to 17 Nov 2026 2359Z · NOTAM 09/114
OBST TOWER LGT (ASR 1262190) 423906.10N0974328.70W (4.9NM NNW 84Y) 2302.5FT (409.8FT AGL) U/S
09/114 NOTAMN<BR> <B>Q) </B>KZMP/QOLAS/IV/M/AE/000/024/4234N09740W005<BR> <B>A) </B> <BR> <B>B) </B>2609180031<BR> <B>C) </B>2611172359<BR> <B>E) </B> TOWER LGT (ASR 1262190) 423906.10N0974328.70W (4.9NM NNW 84Y) 2302.5FT (409.8FT AGL) U/S<BR>
Tower lights — unserviceable
MediumFrom 3 Sep 2026 1408Z to 1 Jan 2027 1408Z · NOTAM 09/018
OBST TOWER LGT (ASR 1261041) 423645.30N0973721.40W (3.0NM NE 84Y) 2081.0FT (308.1FT AGL) U/S
09/018 NOTAMN<br/> <b>Q) </b>KZMP/QOLAS/IV/M/AE/000/021/4234N09740W005<br/> <b>A) </b>84Y<br/> <b>B) </b>2609031408<br/> <b>C) </b>2701011408<br/> <b>E) </b> TOWER LGT (ASR 1261041) 423645.30N0973721.40W (3.0NM NE 84Y) 2081.0FT (308.1FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 84Y right now?
Bloomfield Municipal has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 84Y
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.