9A9 NOTAMs
Active notices for Shiflet Field (9A9), Marion, NC. 3 in force, as of 18 Sep 2026 1917Z. · Open on the map
All of Shiflet Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 3
All 3 active NOTAMs every severity, with windows and raw text
Obstacles · 3 active
Tower lights — unserviceable
MediumFrom 6 Sep 2026 1828Z to 21 Sep 2026 1728Z · NOTAM 09/094
OBST TOWER LGT (ASR 1200078) 353842.30N0814703.00W (11.8NM ESE 9A9) 1487.5FT (267.1FT AGL) U/S
!RDU 09/094 9A9 OBST TOWER LGT (ASR 1200078) 353842.30N0814703.00W (11.8NM ESE 9A9) 1487.5FT (267.1FT AGL) U/S 2609061828-2609211728
Power line lights — unserviceable
MediumFrom 17 Aug 2026 0649Z to 1 Oct 2026 0610Z · NOTAM 08/213
OBST POWER LINE LGT (ASN 2023-ASO-15141-OE) 354313N0815927W (0.9NM E 9A9) 1348FT (92FT AGL) U/S
!RDU 08/213 9A9 OBST POWER LINE LGT (ASN 2023-ASO-15141-OE) 354313N0815927W (0.9NM E 9A9) 1348FT (92FT AGL) U/S 2608170649-2610010610
Power line lights — unserviceable
MediumFrom 17 Aug 2026 0741Z to 1 Oct 2026 0611Z · NOTAM 08/216
OBST POWER LINE LGT (ASN 2023-ASO-15140-OE) 354305N0815915W (1.1NM E 9A9) 1373FT (92FT AGL) U/S
!RDU 08/216 9A9 OBST POWER LINE LGT (ASN 2023-ASO-15140-OE) 354305N0815915W (1.1NM E 9A9) 1373FT (92FT AGL) U/S 2608170741-2610010611
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at 9A9 right now?
Shiflet Field has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about 9A9
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.