KBRD NOTAMs
Active notices for Brainerd Lakes Regional (BRD · KBRD), Brainerd, MN. 5 in force, as of 5 Nov 2026 0714Z. · Open on the map
All of Brainerd Lakes Regional — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 1 min ago
Approach & navaids 1
FAA text
Lighting 2
FAA text
FAA text
Obstacles 2
FAA text
FAA text
All 5 active NOTAMs every severity, with windows and raw text
Approach & navaids · 1 active
Runway 23 — ILS unserviceable
MediumFrom 21 Aug 2026 1125Z to 3 Apr 2028 2111Z (estimated) · NOTAM 08/011
NAV ILS RWY 23 OM U/S
!BRD 08/011 BRD NAV ILS RWY 23 OM U/S 2608211125-2804032111EST
Lighting · 2 active
Taxiway A — edge lights unserviceable
MediumFrom 16 Oct 2026 1757Z to 30 Dec 2026 2359Z · NOTAM 10/019
TWY A, B EDGE LGT LOW INTST U/S
!BRD 10/019 BRD TWY A, B EDGE LGT LOW INTST U/S 2610161757-2612302359
Runway 34 — PAPI unserviceable
MediumFrom 17 Sep 2026 1142Z to 17 Mar 2027 2111Z (estimated) · NOTAM 09/017
RWY 34 PAPI U/S
!BRD 09/017 BRD RWY 34 PAPI U/S 2609171142-2703172111EST
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 18 Oct 2026 0056Z to 18 Nov 2026 2300Z · NOTAM 10/020
OBST TOWER LGT (ASR 1053809) 462055.00N0941328.90W (5.0NM SW BRD) 1695.9FT (505.9FT AGL) U/S
!BRD 10/020 BRD OBST TOWER LGT (ASR 1053809) 462055.00N0941328.90W (5.0NM SW BRD) 1695.9FT (505.9FT AGL) U/S 2610180056-2611182300
Tower lights — unserviceable
MediumFrom 28 Aug 2026 1445Z to 26 Dec 2026 1445Z · NOTAM 08/016
OBST TOWER LGT (ASR 1201453) 463628.40N0940604.20W (12.3NM NE BRD) 1630.9FT (417.0FT AGL) U/S
!BRD 08/016 BRD OBST TOWER LGT (ASR 1201453) 463628.40N0940604.20W (12.3NM NE BRD) 1630.9FT (417.0FT AGL) U/S 2608281445-2612261445
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KBRD right now?
Brainerd Lakes Regional has 5 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KBRD
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.