KFAY NOTAMs
Active notices for Fayetteville Regional/Grannis Field (FAY · KFAY), Fayetteville, NC. 8 in force, as of 5 Nov 2026 1450Z. · Open on the map
All of Fayetteville Regional/Grannis Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Runway 1
FAA text
Approach & navaids 2
FAA text
FAA text
Obstacles 2
FAA text
FAA text
Procedures 2
FAA text
All 8 active NOTAMs every severity, with windows and raw text
Runway · 1 active
Runway 04 — distance remaining sign unserviceable
MediumFrom 4 Nov 2026 0131Z to 11 Nov 2026 1700Z · NOTAM 11/001
RWY 04 6000FT DIST REMAINING SIGN U/S
!FAY 11/001 FAY RWY 04 6000FT DIST REMAINING SIGN U/S 2611040131-2611111700
Approach & navaids · 2 active
VOR/DME out of service
MediumFrom 4 Nov 2026 2113Z to 3 Dec 2026 2000Z · NOTAM 11/002
NAV VOR/DME U/S
!FAY 11/002 FAY NAV VOR/DME U/S 2611042113-2612032000
VOR out of service
MediumFrom 16 May 2025 1321Z to 31 Dec 2026 2000Z (estimated) · NOTAM 05/063
NAV VOR U/S
!FAY 05/063 FAY NAV VOR U/S 2505161321-2612312000EST
Airspace · 1 active
Drone operations
LowFrom 19 Aug 2026 1423Z to 30 Nov 2026 2359Z · NOTAM 08/012
AIRSPACE UAS WI AN AREA DEFINED AS 1.3NM RADIUS OF 345506N0785637W (5.5NM SE FAY) SFC-225FT AGL
!FAY 08/012 FAY AIRSPACE UAS WI AN AREA DEFINED AS 1.3NM RADIUS OF 345506N0785637W (5.5NM SE FAY) SFC-225FT AGL 2608191423-2611302359
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 22 Oct 2026 1849Z to 6 Dec 2026 1849Z · NOTAM 10/030
OBST TOWER LGT (ASR 1002998) 350310.00N0783853.00W (12NM E FAY) 629FT (499FT AGL) U/S
!FAY 10/030 FAY OBST TOWER LGT (ASR 1002998) 350310.00N0783853.00W (12NM E FAY) 629FT (499FT AGL) U/S 2610221849-2612061849
Tower lights — unserviceable
MediumFrom 26 Sep 2026 1058Z to 25 Dec 2026 1158Z · NOTAM 09/029
OBST TOWER LGT (ASR 1000237) 350939.70N0784449.70W (12.3NM NNE FAY) 418.0FT (294.9FT AGL) U/S
!FAY 09/029 FAY OBST TOWER LGT (ASR 1000237) 350939.70N0784449.70W (12.3NM NNE FAY) 418.0FT (294.9FT AGL) U/S 2609261058-2612251158
Procedures · 2 active
Approach ILS OR LOC RWY 4 not available
MediumFrom 3 Sep 2026 1559Z to 15 Apr 2027 1545Z (estimated) · NOTAM 6/0829 · FDC
IAP FAYETTEVILLE RGNL/GRANNIS FLD, FAYETTEVILLE, NC. ILS OR LOC RWY 4, AMDT 18... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FAY VOR OUT OF SERVICE. 2609031559-2704151545EST
!FDC 6/0829 FAY IAP FAYETTEVILLE RGNL/GRANNIS FLD, FAYETTEVILLE, NC. ILS OR LOC RWY 4, AMDT 18... PROCEDURE NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, FAY VOR OUT OF SERVICE. 2609031559-2704151545EST
Approach RNAV (GPS) RWY 4 changed
MediumFrom 15 Aug 2025 1914Z to 15 Aug 2027 1914Z (estimated) · NOTAM 5/8663 · FDC
IAP FAYETTEVILLE RGNL/GRANNIS FLD, FAYETTEVILLE, NC. RNAV (GPS) RWY 4, AMDT 3C... TAA STRAIGHT-IN SECTOR 308/30 CW 128/30 MINIMUM ALTITUDE 3200, SECTOR 128/30 CW 308/30 MINIMUM ALTITUDE 3200. INITIAL HOLDING 3200 TO 6000, IF/IAF 3200.. 2508151914-2708151914EST
!FDC 5/8663 FAY IAP FAYETTEVILLE RGNL/GRANNIS FLD, FAYETTEVILLE, NC. RNAV (GPS) RWY 4, AMDT 3C... TAA STRAIGHT-IN SECTOR 308/30 CW 128/30 MINIMUM ALTITUDE 3200, SECTOR 128/30 CW 308/30 MINIMUM ALTITUDE 3200. INITIAL HOLDING 3200 TO 6000, IF/IAF 3200.. 2508151914-2708151914EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KFAY right now?
Fayetteville Regional/Grannis Field has 8 active NOTAMs, 1 of them affecting runways.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KFAY
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.