KFYJ NOTAMs
Active notices for Middle Peninsula Regional Airport (FYJ · KFYJ), Shacklefords, VA. 2 in force, as of 7 Aug 2026 0916Z.
All of Middle Peninsula Regional Airport — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 11h ago
Lighting 1
Procedures 1
All 2 active NOTAMs every severity, with windows and raw text
Lighting · 1 active
Runway 28 — papi unserviceable
MediumFrom 17 Jun 2026 1348Z to 16 Dec 2026 2111Z (estimated) · NOTAM 06/005
RWY 28 PAPI U/S
06/005 NOTAMR Q) KZDC/QLPAS/IV/BO/A/000/999/3731N07645W005 A) KFYJ B) 2606171348 C) 2612162111EST E) RWY 28 PAPI U/S
Procedures · 1 active
Instrument approach
MediumFrom 6 Aug 2026 1416Z to 6 Sep 2026 1416Z (estimated) · NOTAM 6/2563 · FDC
IAP MIDDLE PENINSULA RGNL, WEST POINT, VA. VOR-A, AMDT 4A... ALTERNATE MINIMUMS NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, HCM VORTAC UNMONITORED. 2608061416-2609061416EST
Q) KZDC/QPIXX/I/NBO/A/000/999/3731N07645W005 A) KFYJ B) 2606281243 C) 2702071243EST E) FYJ MIDDLE PENINSULA RGNL, WEST POINT, VA. VOR-A, AMDT 4A... ALTERNATE MNM NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, HCM VORTAC NOT MNT.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KFYJ right now?
Middle Peninsula Regional Airport has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KFYJ
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.