KMHV NOTAMs

Active notices for Mojave Air & Space Port/Rutan Field (MHV · KMHV), Mojave, CA. 2 in force, as of 21 Sep 2026 1108Z. · Open on the map

All of Mojave Air & Space Port/Rutan Field — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 1 min ago

Taxiway 1

Taxiway F — closed
TWY F CLSD EXC 2HR PPR 661-824-2433
04/004Active · expires in 42d

Obstacles 1

Tower lights — unserviceable
OBST TOWER LGT (ASN 2025-AWP-1527-OE) 350204N1181645W (6.5NM WSW MHV) 3620FT (216FT AGL) U/S
09/018Active · expires in 4d
All 2 active NOTAMs every severity, with windows and raw text

Taxiway · 1 active

Taxiway F — closed
Medium

From 1 Apr 2026 1651Z to 1 Nov 2026 2359Z · NOTAM 04/004 · ICAO A0105/26

TWY F CLSD EXC 2HR PPR 661-824-2433

04/004 NOTAMR 
Q) KZLA/QMXLC/IV/M/A/000/999/3503N11809W005 
A) KMHV 
B) 2604011651 
C) 2611012359 

E) TWY F CLSD EXC 2HR 
PPR 661-824-2433

Obstacles · 1 active

Tower lights — unserviceable
Medium

From 10 Sep 2026 2128Z to 25 Sep 2026 2128Z · NOTAM 09/018

OBST TOWER LGT (ASN 2025-AWP-1527-OE) 350204N1181645W (6.5NM WSW MHV) 3620FT (216FT AGL) U/S

09/018 NOTAMN<br/>
<b>Q) </b>KZLA/QOLAS/IV/M/E/000/037/3503N11809W005<br/>
<b>A) </b>KMHV<br/>
<b>B) </b>2609102128<br/>
<b>C) </b>2609252128<br/> 
<b>E) </b> TOWER LGT (ASN 2025-AWP-1527-OE) 350204N1181645W (6.5NM WSW MHV) 3620FT (216FT AGL) U/S<br/>

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KMHV right now?

Mojave Air & Space Port/Rutan Field has 2 active NOTAMs.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.

More about KMHV

NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.

Something here wrong or out of date? Report a data problem.