KRPJ NOTAMs
Active notices for Rochelle Municipal/Koritz Field (RPJ · KRPJ), Rochelle, IL. 2 in force, as of 21 Sep 2026 0538Z. · Open on the map
All of Rochelle Municipal/Koritz Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 3 min ago
Obstacles 2
All 2 active NOTAMs every severity, with windows and raw text
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 24 Jun 2026 1123Z to 23 Sep 2026 0400Z · NOTAM 06/003
OBST TOWER LGT (ASR 1002681) 415629.10N0885811.30W (5.7NM ENE RPJ) 1195.9FT (297.9FT AGL) U/S
06/003 NOTAMN<br/> <b>Q) </b>KZAU/QOLAS/IV/M/E/000/012/4153N08904W005<br/> <b>A) </b>KRPJ<br/> <b>B) </b>2606241123<br/> <b>C) </b>2609230400<br/> <b>E) </b> TOWER LGT (ASR 1002681) 415629.10N0885811.30W (5.7NM ENE RPJ) 1195.9FT (297.9FT AGL) U/S<br/>
Tower lights — unserviceable
MediumFrom 1 Sep 2026 1125Z to 30 Dec 2026 1125Z · NOTAM 09/001
OBST TOWER LGT (ASR 1064065) 415248.10N0885529.60W (6.9NM E RPJ) 1193.9FT (258.9FT AGL) U/S
09/001 NOTAMN<br/> <b>Q) </b>KZAU/QOLAS/IV/M/E/000/012/4153N08904W005<br/> <b>A) </b>KRPJ<br/> <b>B) </b>2609011125<br/> <b>C) </b>2612301125<br/> <b>E) </b> TOWER LGT (ASR 1064065) 415248.10N0885529.60W (6.9NM E RPJ) 1193.9FT (258.9FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KRPJ right now?
Rochelle Municipal/Koritz Field has 2 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KRPJ
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.