KTEW NOTAMs
Active notices for Mason Jewett Field (TEW · KTEW), Mason, MI. 3 in force, as of 5 Nov 2026 1005Z. · Open on the map
All of Mason Jewett Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Lighting 1
FAA text
Procedures 1
All 3 active NOTAMs every severity, with windows and raw text
Lighting · 1 active
Runway 28 — unserviceable
MediumFrom 27 Aug 2026 1633Z until further notice · NOTAM 08/004
RWY 28 RWY END ID LGT U/S
!TEW 08/004 TEW RWY 28 RWY END ID LGT U/S 2608271633-PERM
Obstacles · 1 active
Power line — erected
LowFrom 24 Sep 2025 1321Z until further notice · NOTAM 09/004
OBST POWER LINE (ASN 2025-AGL-7333-OE) 423446N0842630W (1.2NM NW TEW) 1104FT (182FT AGL) ERECTED
!TEW 09/004 TEW OBST POWER LINE (ASN 2025-AGL-7333-OE) 423446N0842630W (1.2NM NW TEW) 1104FT (182FT AGL) ERECTED 2509241321-PERM
Procedures · 1 active
Takeoff minimums and obstacle departure procedures changed
MediumFrom 5 Oct 2026 1515Z to 5 Oct 2028 1515Z (estimated) · NOTAM 6/7229 · FDC
ODP MASON JEWETT FLD, MASON, MI. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2A... ADD TAKEOFF OBSTACLE NOTE: RWY 28, SILO 1406FT FROM DER, 239FT LEFT OF CENTERLINE, 76FT AGL/979FT MSL (2024-AGL-13164-OE, PERMANENT). ALL OTHER DATA REMAINS AS PUBLISHED. 2610051515-2810051515EST
!FDC 6/7229 TEW ODP MASON JEWETT FLD, MASON, MI. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 2A... ADD TAKEOFF OBSTACLE NOTE: RWY 28, SILO 1406FT FROM DER, 239FT LEFT OF CENTERLINE, 76FT AGL/979FT MSL (2024-AGL-13164-OE, PERMANENT). ALL OTHER DATA REMAINS AS PUBLISHED. 2610051515-2810051515EST
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KTEW right now?
Mason Jewett Field has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KTEW
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.