KVDI NOTAMs

Active notices for Vidalia Regional (VDI · KVDI), Vidalia, GA. 8 in force, as of 6 Nov 2026 1014Z. · Open on the map

All of Vidalia Regional — runways, frequencies, charts and live weather

Live from the FAA NOTAM Management Service · updated 1 min ago

Runway 2

Runway 14/32 — closed
Runway 14/32 is closed.
FAA text
RWY 14/32 CLSD
09/009Active · expires in 56d
Runway 14/32 — work in progress
Work in progress on runway 14/32: men and equipment.
FAA text
RWY 14/32 WIP MEN AND EQPT
09/011Active · expires in 56d

Airport 1

Airport all surface work in progress mowing
Work in progress on airport all surface: mowing.
FAA text
AD AP ALL SFC WIP MOWING
10/007Active · expires in 25d

Taxiway 2

Taxiway C — closed
Taxiway C is closed between runway 25 and runway 32.
FAA text
TWY C BTN RWY 25 AND RWY 32 CLSD
01/006Active · expires in 55d
Taxiway B — closed
Taxiway B is closed.
FAA text
TWY B CLSD
09/010Active · expires in 56d

Obstacles 2

Tower lights — unserviceable
Tower lights are out of service: 715.2 ft MSL (400.3 ft AGL), 6.4 NM west of VDI, at 321230.00N0822948.00W (ASR 1065956).
FAA text
OBST TOWER LGT (ASR 1065956) 321230.00N0822948.00W (6.4NM W VDI) 715.2FT (400.3FT AGL) U/S
09/013Active · expires in 56d
All 8 active NOTAMs every severity, with windows and raw text

Airport · 1 active

Airport all surface work in progress mowing
Medium

From 20 Oct 2026 1350Z to 30 Nov 2026 2200Z · NOTAM 10/007

AD AP ALL SFC WIP MOWING

!VDI 10/007 VDI AD AP ALL SFC WIP MOWING 2610201350-2611302200

Runway · 2 active

Runway 14/32 — closed
High

From 28 Sep 2026 1200Z to 31 Dec 2026 2300Z · NOTAM 09/009

RWY 14/32 CLSD

!VDI 09/009 VDI RWY 14/32 CLSD 2609281200-2612312300
Runway 14/32 — work in progress
Medium

From 28 Sep 2026 1200Z to 31 Dec 2026 2300Z · NOTAM 09/011

RWY 14/32 WIP MEN AND EQPT

!VDI 09/011 VDI RWY 14/32 WIP MEN AND EQPT 2609281200-2612312300

Taxiway · 2 active

Taxiway C — closed
Medium

From 29 Jan 2026 2110Z to 31 Dec 2026 0459Z · NOTAM 01/006

TWY C BTN RWY 25 AND RWY 32 CLSD

!VDI 01/006 VDI TWY C BTN RWY 25 AND RWY 32 CLSD 2601292110-2612310459
Taxiway B — closed
Medium

From 28 Sep 2026 1200Z to 31 Dec 2026 2300Z · NOTAM 09/010

TWY B CLSD

!VDI 09/010 VDI TWY B CLSD 2609281200-2612312300

Airspace · 1 active

Drone operations
Low

From 13 Aug 2026 2019Z to 31 Dec 2026 1330Z · NOTAM 08/009

AIRSPACE UAS WI AN AREA DEFINED AS .25NM RADIUS OF VDI SFC-500FT AGL

!VDI 08/009 VDI AIRSPACE UAS WI AN AREA DEFINED AS .25NM RADIUS OF VDI SFC-500FT AGL 2608132019-2612311330

Obstacles · 2 active

Tower lights — unserviceable
Medium

From 29 Sep 2026 1914Z to 31 Dec 2026 2359Z · NOTAM 09/013

OBST TOWER LGT (ASR 1065956) 321230.00N0822948.00W (6.4NM W VDI) 715.2FT (400.3FT AGL) U/S

!VDI 09/013 VDI OBST TOWER LGT (ASR 1065956) 321230.00N0822948.00W (6.4NM W VDI) 715.2FT (400.3FT AGL) U/S 2609291914-2612312359
Tower lights — unserviceable
Medium

From 3 Nov 2026 2314Z to 3 Mar 2027 2314Z · NOTAM 11/004

OBST TOWER LGT (ASR 1253466) 321540.50N0821558.90W (6.8NM NE VDI) 602.7FT (409.8FT AGL) U/S

!VDI 11/004 VDI OBST TOWER LGT (ASR 1253466) 321540.50N0821558.90W (6.8NM NE VDI) 602.7FT (409.8FT AGL) U/S 2611032314-2703032314

NOTAMs are shown for planning. Always confirm with an official preflight briefing.

Frequently asked

Are there any NOTAMs at KVDI right now?

Vidalia Regional has 8 active NOTAMs, 2 of them affecting runways, 1 of high significance.

What is a NOTAM?

A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.

What is an FDC NOTAM?

A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.