PHJR TAF
Terminal aerodrome forecast for Kalaeloa (John Rodgers Field) (JRF · PHJR), Kapolei, HI. Issued 5 Nov 2026 1120Z, valid 1200Z to 1200Z, decoded period by period below. · Open on the map
All of Kalaeloa (John Rodgers Field) — runways, frequencies, charts and live weatherTAF issued 5 Nov 2026 1120Z
valid 1200Z to 1200ZTAF PHJR 051120Z 0512/0612 VRB06KT P6SM FEW045 FM052000 06010G20KT P6SM FEW030 SCT050 FM060600 VRB06KT P6SM FEW030
Times are UTC (Zulu), as they appear in the bulletin.
Period by period
| Period (UTC) | Change | Wind | Vis | Ceiling | Sky | Cat |
|---|---|---|---|---|---|---|
| 1200Z to 2000Z | Initial | Variable at 6 kt | 6+ SM | Clear | Few at 4,500 ft AGL | VFR |
| 2000Z to 0600Z | FM | 060° at 10-20 kt | 6+ SM | Clear | Few at 3,000 ft AGL, Scattered at 5,000 ft AGL | VFR |
| 0600Z to 1200Z | FM | Variable at 6 kt | 6+ SM | Clear | Few at 3,000 ft AGL | VFR |
What the change groups mean
- FM
- From — a rapid, permanent change to the conditions that follow.
What the categories mean
- VFR
- Visual flight rules — ceiling above 3,000 ft and visibility greater than 5 SM.
Frequently asked
What is the current TAF for PHJR?
The forecast issued 5 Nov 2026 1120Z for Kalaeloa (John Rodgers Field) reads: TAF PHJR 051120Z 0512/0612 VRB06KT P6SM FEW045 FM052000 06010G20KT P6SM FEW030 SCT050 FM060600 VRB06KT P6SM FEW030
How far ahead does a TAF forecast?
A TAF covers a 24-hour period at most airports and 30 hours at larger ones, issued four times a day at 0000Z, 0600Z, 1200Z and 1800Z. It describes conditions within roughly 5 statute miles of the airport, not the surrounding area.
What do FM, BECMG and TEMPO mean?
FM (from) marks a rapid, permanent change at the stated time. BECMG (becoming) marks a gradual change over the stated window. TEMPO marks conditions expected for less than half the period, in spells of under an hour each. PROB30 and PROB40 give the probability of the conditions that follow.
More about PHJR
Forecasts from the US National Weather Service Aviation Weather Center. Times are UTC (Zulu). For planning and education only — always confirm with an official preflight briefing.
Something here wrong or out of date? Report a data problem.