T79 NOTAMs
Active notices for Skyway Manor (T79), Pearland, TX. 3 in force, as of 18 Sep 2026 1253Z. · Open on the map
All of Skyway Manor — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated 2 min ago
Obstacles 2
All 3 active NOTAMs every severity, with windows and raw text
Airspace · 1 active
Pje
LowFrom 18 Sep 2026 2330Z to 19 Sep 2026 0030Z · NOTAM 09/412
AIRSPACE PJE WI AN AREA DEFINED AS 1NM RADIUS OF IAH173025 (.9NM S T79) SFC-4000FT
!CXO 09/412 T79 AIRSPACE PJE WI AN AREA DEFINED AS 1NM RADIUS OF IAH173025 (.9NM S T79) SFC-4000FT 2609182330-2609190030
Obstacles · 2 active
Tower lights — unserviceable
MediumFrom 27 May 2026 1500Z to 30 Nov 2026 2359Z · NOTAM 05/730
OBST TOWER LGT (ASR 1275173) 293832.50N0952657.50W (8.2NM NW T79) 382.5FT (323.8FT AGL) U/S
05/730 NOTAMN<BR> <B>Q) </B>KZHU/QOLAS/IV/M/E/000/004/2933N09519W005<BR> <B>A) </B> <BR> <B>B) </B>2605271500<BR> <B>C) </B>2611302359<BR> <B>E) </B> TOWER LGT (ASR 1275173) 293832.50N0952657.50W (8.2NM NW T79) 382.5FT (323.8FT AGL) U/S<BR>
Tower lights — unserviceable
MediumFrom 13 Sep 2026 0102Z to 12 Dec 2026 0202Z · NOTAM 09/346
OBST TOWER LGT (ASR 1052472) 293330.70N0951718.10W (2.0NM E T79) 248.7FT (199.8FT AGL) U/S
09/346 NOTAMN<br/> <b>Q) </b>KZHU/QOLAS/IV/M/AE/000/003/2933N09519W005<br/> <b>A) </b>T79<br/> <b>B) </b>2609130102<br/> <b>C) </b>2612120202<br/> <b>E) </b> TOWER LGT (ASR 1052472) 293330.70N0951718.10W (2.0NM E T79) 248.7FT (199.8FT AGL) U/S<br/>
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at T79 right now?
Skyway Manor has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about T79
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.