KTAN NOTAMs
Active notices for Taunton Municipal/King Field (TAN · KTAN), Taunton, MA. 3 in force, as of 21 Sep 2026 0520Z. · Open on the map
All of Taunton Municipal/King Field — runways, frequencies, charts and live weatherLive from the FAA NOTAM Management Service · updated just now
Obstacles 1
Procedures 2
All 3 active NOTAMs every severity, with windows and raw text
Obstacles · 1 active
Tower lights — unserviceable
MediumFrom 3 Sep 2026 1436Z to 2 Nov 2026 2359Z · NOTAM 09/001
OBST TOWER LGT (ASR 1210211) 415335.20N0705635.00W (3.4NM ENE TAN) 406.2FT (348.1FT AGL) U/S
09/001 NOTAMN<BR> <B>Q) </B>KZBW/QOLAS/IV/M/AE/000/005/4152N07100W005<BR> <B>A) </B>KTAN<BR> <B>B) </B>2609031436<BR> <B>C) </B>2611022359<BR> <B>E) </B> TOWER LGT (ASR 1210211) 415335.20N0705635.00W (3.4NM ENE TAN) 406.2FT (348.1FT AGL) U/S<BR>
Procedures · 2 active
Instrument approach
MediumFrom 6 Feb 2025 1256Z to 6 Feb 2027 1256Z (estimated) · NOTAM 5/0632 · FDC
IAP TAUNTON MUNI/KING FLD, TAUNTON, MA. RNAV (GPS) RWY 30, AMDT 2... LPV DA NA. LNAV/VNAV DA NA. 2502061256-2702061256EST
Q) KZBW/QPIXX/I/NBO/A/000/999/4152N07100W005 A) KTAN B) 2502061256 C) 2509181254EST E) TAN TAUNTON MUNI/KING FLD, TAUNTON, MA. RNAV (GPS) RWY 30, AMDT 2... LPV DA NA. LNAV/VNAV DA NA.
Instrument approach
MediumFrom 6 Feb 2025 1256Z to 6 Feb 2027 1256Z (estimated) · NOTAM 5/0631 · FDC
IAP TAUNTON MUNI/KING FLD, TAUNTON, MA. RNAV (GPS) RWY 12, ORIG-A... LPV DA NA. LNAV/VNAV DA NA. 2502061256-2702061256EST
Q) KZBW/QPIXX/I/NBO/A/000/999/4152N07100W005 A) KTAN B) 2502061253 C) 2509181252EST E) TAN TAUNTON MUNI/KING FLD, TAUNTON, MA. RNAV (GPS) RWY 12, ORIG-A... LPV DA NA. LNAV/VNAV DA NA.
NOTAMs are shown for planning. Always confirm with an official preflight briefing.
Frequently asked
Are there any NOTAMs at KTAN right now?
Taunton Municipal/King Field has 3 active NOTAMs.
What is a NOTAM?
A Notice to Air Missions is a filed notice of a temporary condition a pilot needs to know about: a closed runway or taxiway, an out-of-service navaid or approach light, a crane near the approach path, or restricted airspace. Checking them is a required part of preflight action under 14 CFR 91.103.
What is an FDC NOTAM?
A Flight Data Center NOTAM is issued by the FAA rather than the airport, and covers regulatory matters: amendments to instrument approach procedures, changes to charted minimums, and temporary flight restrictions.
More about KTAN
NOTAMs from the FAA NOTAM service. Times are UTC (Zulu). For planning and education only — NOTAM review is required preflight action under 14 CFR 91.103 and must be done through an official source.
Something here wrong or out of date? Report a data problem.